The project content in 2013 can be divided into four sections. First, constructing and promoting landfill inspection with three level examinations. Second, conducting the maintenance of landfill site information platform online and reviewing and evaluating information. Third, to assist EPA (Environmental Protection Administration Executive Yuan) to inspect public landfills which accept and treat wastes producing from industries. Fourth, to build a model and guideline for landfill reusing procedure. The completed tasks in this project have shown as follow: 1. Assisting EPA to conduct one presentation of three levels inspection project for Environmental Protection Bureau in local government and one presentation about industrial waste landfill for Northern, Central, and Southern Branches of the Bureau of Environmental Inspection of the Environmental Protection Administration. 2. Assisting 22 local environmental protection bureaus completed three levels inspection tasks in 68 operating landfills. 3. Landfill information platform system maintenance and update. Level 1 and 2 landfill checking list forms have been uploaded successfully. 4. The information of general and industrial wastes transporting to public landfills are collected from ‘Industrial Waste Report and Management System’ and working report collected from landfill information platform system from January 2013 to 24th February in 2014 had been summarized. 5. The summary of landfill inspection results conducted by three area of Environmental Inspection of the Environmental Protection Administration had been completed. 6. Establishing the economic efficiency formula and relative coefficients for landfill reuse procedure. The achievement of this project in 2013 include assisting EPA to conduct two presentations and assisting 22 local environmental protection bureaus to implement the three levels inspection task in 68 operating landfills. Each local environmental protection bureau has well control to general waste, also all wastes are treated properly. Especially in Yunlin county, Hualien county and Taitung county, general wastes in these three counties all end up in landfill and others are transferred to incinerators. Furthermore, landfills can be evaluated whether the condition complies to the regulations or not by first level self-checking list and then improve it based on results. However, it still requires local county environmental protection bureaus using second level examination to confirm the result of first level examination and then improve it. About the third level examination of EPA, this method is used to supervise local governments and assist landfills to improve their deficiency and satisfy regulations. Landfill information platform system contains first and second level self-checking lists. This function can help EPA to follow up the current landfill condition and its improvement. The data of general waste disposal in public landfill are collected from ‘Industrial Waste Report and Management System’ compare to the number of waste transporting to landfill which generated from landfill information platform system and landfill remaining capacity. Then, EPA can control the public landfill conditions effectively based on those reports. The summary of two landfill inspection results completed by three area of Environmental Inspection of the Environmental Protection Administration which reveal that eight industrial landfill improved its deficiencies before the second inspection. However, the five landfill sites still require continuing improvements. There are variety of operation fee during landfill reusing procedure that will be charged. It contains waste sorting fee, surplus earth and gravel disposal fee, waste medium disposal fee and operation management fee. A standard calculation method will assist to minimize the expense differences. According to the investigation of current landfill reusing experience in some counties, although there are economic incentive, people still concern the effect of industrial waste disposal. Moreover, there is not appropriate legislation to regulate it. Therefore, this method has been suspended currently.
Keyword
public landfill, three levels inspection, landfill reuse
Open
top